COLT Communications

London

Shine

ICO Global Communications

Uxbridge

Shine

Jiway

London

Shine

Metal and Commodity

London

Shine

Residential House

Bromley

Shine

The Reform Club

Manchester

Shine

NEWskies Satellites

The Hague, Holland

Shine

Metropolitan Police

Kent

Shine

Gartmore Investments

London

Shine

Ampersand

Manchester

Shine

Norimet, London

October 5th, 2007 by John Pepper

Organise company relocation to new premises, design and space planning new offices, turnkey fit out for new meeting rooms, Trading area, general office and open plan finance area.

 Norimet, London

Posted in Interior Case Studies having no comments »

96 Plaistow Lane, Bromley

October 5th, 2007 by John Pepper

96 Plaistow Lane, BromleyThis 1920’s house had inherent character and quality, especially to the windows, which provided beautiful natural light to 3 elevations. To this end, all services, walls, plaster work were stripped back to bare brick shell.

From Basement to Roof all existing structure was removed, including excavation of the basement approach, forming a stone stairway and balustrade of generous proportion to enable the basement to become a feature within the room. With removal of the old coal shute walls, we have created a utility area and boiler housing with its own natural light thru’ a larger sub ground window and escape light well to car parking area. The basement has also been fully tanked out.

All new partitions to ground floor are constructed to top specifications, consisting of twin skin plaster board to both sides of 75mm metal stud work with acoustic infill. All skirtings and architraves are set into outer skin with stop beads and final plaster finish, creating a continuous separation detail between all wood work and plaster finish. Read the rest of this entry »

Posted in Residential, Interiors having no comments »

Oxford bus Land control centre

October 5th, 2007 by John Pepper

Design, planning and supply and installation of all console desks, operator seating, adjustable/mobile display wall.

Outline finishes schedule and supervision of screen and multi-viewer system wit security consultant Barclay Security and Risk Management Systems. Read the rest of this entry »

Posted in CCTV NOC, Control Rooms having no comments »

Metal & Commodity, London

October 5th, 2007 by John Pepper

Metal & Commodity, LondonOriginal fit-out 1993 - £350,000.00. Various alteration projects 1994 – 1998, reception alterations, new meeting/conference suite and new ten position Trading desk.

Over-all project management for complete fit-out of high grade finishes to offices, conference suite, and open plan trading floor. New mezzanine IT equipment rack rooms.

Upgrade of air conditioning systems, services alarms and new access control systems. Design and equipping of modular trading desk.

Posted in Dealer & Trading rooms, Control Rooms, Dealing Rooms, Interiors having no comments »

Kingston Inmedia, Bedford

October 5th, 2007 by John Pepper

Kingston Inmedia, BedfordUpgrade of existing Ground station MCR facility

Design and planning with Over-all project management for curved modular GRP consoles and the design and supply of curved modular GRP display wall to house plasma and LCD flat panel monitor screens.

Re-planning of equipment rack rooms, installation of new M&C system. Upgrade of air conditioning systems, lighting , suspended ceilings and new access control system.

Posted in Broadcast MCR, Control Rooms having no comments »

Eutelsat, Rambouillet

October 5th, 2007 by John Pepper

Eutelsat Teleport – Rambouillet March 2007Timely transfer of satellite services from HQ in Paris. Spice Design produced a project review report setting out the detailed ergonomic and planning requirements to transfer the satellite services from HQ in Paris to Rambouillet. The summary included up to date compliance for EN ISO standards, outline cost plan and contract programme.

The scope included:

Strip out exg equipment racks, New pressurised raised floor, Fully redundant M&E systems. Acoustic wall treatment,  Electrically operated blinds, Viewing gallery, Main display wall - 67” Retro projection and Secondary displays – 42” LED screen arrays.

Posted in Satellite Operations, Control Rooms having no comments »

IBC 2008

October 2nd, 2007 by John Pepper

IBC returns to the RAI Centre in Amsterdam next year, with the conference opening on 11 September and the exhibition running from 12 to 16 September 2008. Check your diary now!

Posted in Events having Comments Off

IPE, New York & London

September 27th, 2007 by John Pepper

IPE, New York & LondonThe Chief Executive Officer of IPE, a long standing client of Spice Design who previously held senior management posts at the Stock Exchange and Nasdaq, again enlisted the design services of Spice.

Spice were brought in to design and manage new facilities for premises adjacent to Tower Bridge in the form of new reception, conference suites and executive offices.

Read the rest of this entry »

Posted in Receptions, Interiors having no comments »

Eutelsat Teleport – Rambouillet March 2007

September 24th, 2007 by John Pepper

side viewwindow viewEutelsat Teleport – Rambouillet March 2007Following the award of a consultancy appointment by Eutelsat to Spice Design to carry out a planning report for the transfer of satellite services from the Paris HQ in to Rambouillet, Spice were subsequently retained to produce a full RFP [ Cahier de charges ] The existing teleport near Rambouillet was purchased from France telecom, where Eutelsat already operated major transmission services for voice, data and communication via their ever increasing fleet of satellites.Display wallThe building facilities required a major over haul to bring up to the standard required for the anticipated transfer of services. Following a site survey and detailed briefing from the Eutelsat senior management and the submission of Spice’s initial report. which included detailed ergonomic and planning requirements, Spice and Ceng produced detailed package of drawings and specifications with comprehensive power and lighting schedules for implementation by the Paris based architectural and engineering team. Read the rest of this entry »

Posted in Satellite Operations, News having no comments »

IBC Amsterdam 2007

September 24th, 2007 by John Pepper

This year at IBC 2007 Amsterdam, sees Spice/CEng launch their new “Toolkit” product which will deliver automated project infrastructure design, planning, cost prediction with project management continuity.

This “Toolkit” is being developed and will be utilised by Spice/CEng to provide the “missing link” between the larger professional team and the client user. The system operates by the input of a Client’s fundamental operational, technical and physical requirements, which are processed by the “Toolkit” utilising a comprehensive equipment/materials database  to “spit out ” out the initial “first cut” planning criteria predictions.

Visit the Spice/Ceng team in Hall 1 , Stand 558c.

Posted in News having no comments »